Construction of new Musanze hydropower plant which was launched on 21st June 2017 is expected to add at least 3.6 megawatts to the national grid. The plant is being constructed on Mukungwa River in Nkotsi Sector in two phases; Rwaza I to produce 2.6 megawatts, and Rwaza II, the second phase will start later along the […]
↧